Location
SQ FT
TYPE
Mt. Morris, IL
2,655
TBA
PG broke ground on construction of this facility in the spring of 2021.
This bank facility was built using PG Prefabricated panels. Efficiencies derived from the prefabricated panel process made it possible for PG to deliver a design with high-quality features while reducing construction time to just five months, ultimately saving time and money for our client.
ADDRESS:
6000 E State Street
Suite 502
Rockford, IL 61108
CALL US:
(815) 654-9700
© 2022 PG Design + Build | 7VIBESMEDIA