Projects

NB&T, Sandwich

Location

SQ FT

COST

TYPE

Sandwich, Illinois

2750

-

TBA

This beautiful retail bank features an open retail lobby, two teller stations, two drive through lanes, an ATM, four offices, a conference room, and an employee break room.

THE POWER OF PREFAB

While traditional construction often takes 7-9 months, this facility was constructed using prefabricated panels?reducing construction time to just 4.5 months!? To see a couple of the prefabricated panels being placed on the construction site, scroll down the photos. You may notice that the exterior brick and stone are already attached.? Because prefabricated panels are assembled indoors in a controlled environment (eliminating the weather issues of onsite outdoor assembly), the final result is a higher-quality finish.

?We have a successful long-term relationship with PG and Steve Howlett. Steve works hard to stay current on the industry and the design trends, and has always delivered superior concepts and service to our organization.?
-Brad Brown, Senor Retail Project Manager/Branch Transformation, First Midwest Bank